• <tfoot id="eeeee"><noscript id="eeeee"></noscript></tfoot>
    • <nav id="eeeee"></nav>
    • 香蕉蕉亚亚洲aav综合,国产导航在线,另类欧美日韩,久久毛片基地
      Installation, safety operation rules rock particles machine
      Rock particles machine installation instructions
        1, rocking granule machine for the packing, after devanning moved to appropriate use of local, you can use the pad after.
        Unit 2, electrical wiring, is not subject to the direction of rotation limit, line is composed of a base below through the belt cover connected to the switch card, cable clamp.
        Swing granulator operation rules
        1 check the rock particles machine parts fasteners are loose, the hopper and no sundries, lubricating oil is sufficient worm gear reducer. Start rocking particle machine, mix into the bucket, the swing rotary drum, squeeze the material particles are formed through the screen, such as grinding pieces, should gradually joined, not filled, so as to avoid the pressure is too large, and the screen vulnerable. Powder hopper such as powder stop, must not be hand to shovel, so as to avoid the injury accident, application of bamboo spatula or stop work.
        2 electrical control combined switch for HJ1010/3 type, combination switch is located on the left side of the fuselage, directly control the motor start and stop, idle for two minutes, no abnormal phenomenon can work.
        3 five angle hob on both sides of a two screen tension rod, rod end is provided with a bakelite knob and a ratchet wheel, to the hopper lateral rotation knob, can make the screen to collapse, ratchet and pawl prevent screen loose, tighten the two fastening screws work, avoid the screen tension rod axial moving.
        4 screen number should be selected in accordance with the required particle size, according to the requirements of users of self.
        5 screen width equal to the length of the hopper file 200mm. Length should be able to guarantee the wrap angle of five hob, the two ends of the locking rod embedded screen slot and at least a week for the appropriate wrapping.
        6 hopper front cover and back cover of the gear shaft with an adjustment screw, you can adjust the five corners of the hob and gear axial clearance.
        Rock particles machine maintenance
        1, regular inspection of rock particles machine parts, was once a month, check the worm, worm, bearings and other activities are flexible and wear, found absenteeism depression should be repaired in a timely manner, not free to use.
        2, rocking granule machine should be kept in dry, clean room, the air shall not contain acids, and other parts with corrosive gases flowing place.
        3, rock particles machine once after use or shutdown, should remove the rotary drum washing and brushing bucket remaining powder, and then reassembled, prepare for the next use.
        4, such as stops for a long time, must will swing particle machine body wipe clean, parts of the surface coated with anti-rust oil, cloth on the cover.
      Related News:
      · Innovation, energy saving, environmental protectio  
      · Vacuum dryer product performance characteristics a  
      · Vacuum dryer used for inspection and debugging wor  
      · Difficulties and reasons cannot start mixing machi  
      · The correct operation method using vacuum dryer  
      · Development advantages and characteristics of dome  
      · The difference between the special vacuum dryer an  
      · Detailed description of each component characteris  
      · The dominant position in the whole vacuum dryer dr  
      · Trough type mixer sometimes appear large area leak  
      Related Products:
      · PGL Spray Drying Granulator
      · High speed mixer
      · SET series double screw extrusion pelletizer
      · VI forced mixer
      · Mixing machine W series
      · Powder machine ZSJ series vibrating screen
      · FZ series of crushing granulator
      · Chinese medicine grinder
      · DWT series of drier for dehydrated vegetables
      · Multi-layer belt dryer

      Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
      Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

      主站蜘蛛池模板: 国产做a爱视频免费无遮挡| 国产成人人人97超碰超爽8| 延安市| 粗大猛烈进出高潮视频免费看| 伊在人亚洲香蕉精品播放| 亚洲成av人影院无码不卡| 国产粉嫩高中无套进入| 中文字幕亚洲欧美日韩2019| 另类 专区 欧美 制服| av秘 无码一区二区三区| 精品国产一区二区三区香蕉| 少妇性l交大片7724com| 人妻少妇伦在线麻豆m电影| 欧美成人国产精品高潮| 中文字幕一区二区三区波多野结衣 | 亚洲 欧洲 日韩 综合在线| 国产成+人+综合+亚洲专区 | 夜夜爽夜夜叫夜夜高潮| 久久精品精选| 最新国自产拍av| 国产成人欧美| 平顶山市| 宾阳县| 视频国产精品丝袜第一页| a网站在线观看| 欧美一区二区三区国产精品| 中文日韩亚洲欧美制服 | 久久亚洲色一区二区三区| 男女猛烈激情xx00免费视频| 色av专区无码影音先锋| 亚洲熟女少妇精品| 天天上天天添天天爱少妇| 成人无码看片在线观看免费| 第一区免费在线观看| 久久久亚洲国产精品主播| 免费不卡人妻无码中出| 天堂网www在线资源网| 欧美激情视频一区二区三区免费| 好吊日免费视频| 国产精品美人久久久久久AV| h动漫无遮挡成本人h视频|