      How to properly install swing particles?
      Rock particles machine installation instructions
        The rock particles machines for the entire packing, unpacking after moved to the appropriate use of local, pad level to use.
        Electrical circuit means is not subject to the restriction of the rotational direction, the line is clamped by the base below to switching, the cable card via the belt cover.
        1.1 before installing the first reference to the packing list check parts are complete and damage the rock particles.
        1.2 installation, refer to the installation diagram which rock particles machine supporting chassis must be mounted horizontally on the foundation, the foundation should have sufficient stiffness and strength to support the the vibrating screen dynamic load and static load.
        1.3 can take advantage of the screen box trunnion lifting screening machine, lifting the entire sieve can not be directly linked to the exciter.
        Should ensure that a class of non-moving parts of the screen box and hopper, chute kept to a minimum 75mm gap between 1.4 installed swing particles machine screen machine.
        1.5 swing the particle machine equipment installed, maintained around the screen surface level, otherwise, you can adjust the spring seat support pad thin sheet iron.
        1.6 springs must be in a vertical state, the spring fixation in the sieve box of the trunnion.
        1.7 the vibration sieve drive direction given is standing on the feed side, face the direction of the flow of material, observed the motor position, the left-hand side to the left to the driver, the right-hand side for the right to drive. The vibrating screen with symmetrical design, both sides pulley. Replace the motor position to change the direction of the left and right drive.
        1.8 to ensure that the tension of the V-belt has a sufficient amount of adjustment the two pulley end surface adjustment in a plane.
        The 1.9 swing particles machine before the trial must be by hand (or other) rotating exciter. Flexible rotation, the jamming before starting rock particles.
        No-load commissioning, should be less than 2 hours after the end of the installation and adjustment of 1.10 rock particles, smooth operation, no abnormal noise bearing maximum temperature does not exceed 75 ° C.
        Rock particles machine instructions
        1. Use: starting rock particles, the mixture was poured into a hopper, and by the the rotating drum swing, squeezing the material through a screen to form particles, such as crushed pieces, should be added gradually, not fill, in order to avoid pressure is too large the screen wearing. 2. Note: Hopper as powder stop high, must not spent shovel, avoid hand injury accident, application of bamboo shovel or parking.
        Rock particles machine maintenance instructions
        1. Periodically check the parts, once a month, check the worm gear, worm gear, bearing and active part of the flexible and wear, discovered defects should be repaired in time, shall not be reluctant to use.
        2. Rock particles machine should be placed on a clean dry indoor atmosphere acids and its parts shall not contain corrosive gases flowing places.
        3. The rock particles machine after use or lockout, wash or brush cleared bucket remaining powder will remove the rotating drum, and then properly installed and ready to work for the next.
        4. Disable a longer time, must be rock particles systemic wipe clean parts of the glossy coated with anti-rust oil with a cloth booth
      Related News:
      · Innovation, energy saving, environmental protectio  
      · Vacuum dryer product performance characteristics a  
      · Vacuum dryer used for inspection and debugging wor  
      · Difficulties and reasons cannot start mixing machi  
      · The correct operation method using vacuum dryer  
      · Development advantages and characteristics of dome  
      · The difference between the special vacuum dryer an  
      · Detailed description of each component characteris  
      · The dominant position in the whole vacuum dryer dr  
      · Trough type mixer sometimes appear large area leak  
      Related Products:
      · PGL Spray Drying Granulator
      · High speed mixer
      · SET series double screw extrusion pelletizer
      · VI forced mixer
      · Mixing machine W series
      · Powder machine ZSJ series vibrating screen
      · FZ series of crushing granulator
      · Chinese medicine grinder
      · DWT series of drier for dehydrated vegetables
      · Multi-layer belt dryer

      Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
      Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

      主站蜘蛛池模板: 777米奇色狠狠888俺也去乱| 欧美日韩国产1区| 武清区| 亚洲精品久久午夜麻豆| 日日躁夜夜躁狠狠躁超碰97| 久久精品国产999久久久| 新疆| 国产综合有码无码中文字幕| 亚洲熟妇av日韩熟妇在线| 久久精品午夜一区二区福利| 在线亚洲精品自拍| 亚洲开心婷婷中文字幕| 熟妇人妻av无码一区二区三区| 无码av孕妇专区| 国产午夜精华无码网站| 欧美zozo另类特级| 亚洲日韩精品制服丝袜AV| 好紧好爽好深再快点av在线| 日韩欧美卡一卡二卡新区| 景泰县| 国产精品综合色区在线观看| 麻豆av字幕无码中文| 日本国产制服丝袜一区| 亚洲成AV人不卡无码| 丰满人妻中伦妇伦精品app | 国产成人欧美综合在线影院| 欧美最猛黑人xxxxx猛交| 中文字幕无码成人片| 夜夜躁日日躁狠狠久久av| 国产成人精品福利一区二区三区| 亚洲一区 日韩精品 中文字幕| 亚洲男人av天堂男人社区| 91网在线| 久久精品人人做人人综合试看| 99精品久久99久久久久胖女人| 色噜噜狠狠一区二区三区| 亚洲国产成人自拍| 日韩人妻无码一区2区3区里沙| 欧美激情性xxxxx高清真| 亚洲无码精品视频| 亚洲无码刺激|